Click on the header to any of our posts at the bottom of our pages and it will change color, from black to red. This will open the photos of that event for you to see our construction progress as well as photos related to that topic. As our posts continue, the site automatically adds [...]
Outside prayer wheels finished!
Josiah and Allen finished building our temple prayer wheels, putting the bearings in so they can turn freely and placing the houses on our front porch. When Khenchen comes he will let us know where he would like them permanently installed on the property. Note the rainbow blessing onto the prayer wheel in our last [...]
Khenchen Tsewang Gyatso’s Upcoming Fall 2008 Tour
17th to 26th October – New York
27th to 29th October – Ohio
29th October to 9th November – Ottowa
10th to 17th November – Ohio
18th to 24th November – Pensacola
25th November to 3rd December – Washington D.C.
3rd to 9th December – San Francisco
10th to 17th December – Montana
18th to 26th December – Dallas and Austin Texas
26th return [...]
Amish work on the inside of our new entranceway
When this room is finished, we will have a place to put all our coats and shoes here before entering the shrineroom. Eli built a long coat rack and the drywall is done, so we can now begin to paint.

October 10, 2008 
